top of page
Search

2-9-22 Union Hotel Update

  • keith85601
  • Feb 9, 2022
  • 1 min read

Starting on 2-9-2022 the removal of the roof structure of the Union Hotel is to begin. This is only a temporary measure to maintain the integrity of the building. The roof structure will be reconstructed to match the existing at a later date.

 
 
 

Commentaires


bottom of page